|
|
Lot # Date Pit Level Location & Notes Grid sq: 200
1988 05/25/88 10 12 X=304.528
Y=494.730 8-I 201
1988 05/23/88 10 10 X=304.528
Y=494.730 8-I Element
1 NO CERAMICS 202
1988 05/25/88 0 0
X=600.000 Y=300.000
11-H SSC 203
1988 05/23/88 0 0
X=400.000 Y=600.000
9-K SSC 204
1988 05/23/88 0 0
X=200.000 Y=400.000
7-I SSC 205
1988 05/23/88 0 0
X=500.000 Y=400.000
10-I SSC 206
1988 05/25/88 0 0
X=600.000 Y=500.000
11-J SSC 207
1988 05/25/88 0 0
X=600.000 Y=400.000
11-I SSC 208
1988 05/24/88 0 0
X=300.000 Y=600.000
8-K SSC 209
1988 05/25/88 0 0
X=0.000 Y=500.000
0- SSC 210
1988 05/24/88 0 0
X=200.000 Y=500.000
7-J SSC 211
1988 05/24/88 0 0
X=500.000 Y=300.000 10-H
SSC 212
1988 05/24/88 0 0
X=300.000 Y=300.000
8-H SSC 213
1988 05/23/88 0 0
X=400.000 Y=600.000
9-K SSC 214
1988 05/24/88 0 0
X=400.000 Y=300.000
9-H SSC 215
1988 05/24/88 0 0
X=200.000 Y=400.000
7-I SSC 2nd try, 20cm 216
1988 6
9 X=240.918
Y=386.266 7-H 217
1988 6
10 X=240.918
Y=386.266 7-H 218
1988 6
9 X=240.918
Y=386.266 7-H 219
1988 6
8 X=240.918
Y=386.266 7-H 220
1988
6 11
X=240.918 Y=386.266
7-H 221
1988 6
4 X=240.918
Y=386.266 7-H 222
1988 6
7 X=240.918
Y=386.266 7-H 223
1988 6
4 X=240.918
Y=386.266 7-H 224
1988 6
3 X=240.918
Y=386.266 7-H 225
1988 6
6 X=240.918
Y=386.266 7-H 226
1988 05/23/88 0 0
X=300.000 Y=400.000
8-I SSC 227
1988 6
5 X=240.918
Y=386.266 7-H 228
1988 6
5 X=240.918
Y=386.266 7-H Level 5B 229
1988 05/23/88 0 0
X=400.000 Y=400.000
9-I SSC 230
1988 5
1 X=221.646
Y=379.169 7-H 231
1988 5
1 X=221.646
Y=379.169 7-H NO
CERAMICS 232
1988 6
3 X=240.918
Y=386.266 7-H 233
1988 5
3
X=221.646 Y=379.169
7-H 234
1988 5
3 X=221.646
Y=379.169 7-H 235
1988 5
4 X=221.646
Y=379.169 7-H 236
1988 5
3 X=221.646
Y=379.169 7-H Level 3B 237
1988 05/26/88 11 3
X=283.538 Y=544.081
7-J 238
1988 0
0 X=385.000
Y=670.000 8-K along
wall, S Str. 5 W side 239
1988 5
3 X=221.646
Y=379.169 7-H 240
1988 5
2 X=221.646
Y=379.169 7-H 241
1988 05/26/88 11 3
X=283.538 Y=544.081
7-J 242
1988 0
0 X=385.000
Y=670.000 8-K Str. 5 243
1988 05/27/88 0 0
X=300.000 Y=800.000
8-M SSC 244
1988 05/27/88 0 0
X=100.000 Y=700.000
6-L SSC 245
1988 05/27/88 0 0
X=232.000 Y=788.000
7-L found piled together in watermelon patch, SE corner 246
1988 05/26/88 11 2
X=283.538 Y=544.081
7-J 247
1988 05/27/88 0 0
X=200.000 Y=800.000
7-M SSC 248
1988 0
0 X=340.000
Y=730.000 8-L Str. 1
Group E 249
1988 05/27/88 0 0
X=400.000 Y=400.000
9-I SSC 250
1988 0
0 X=320.000
Y=696.000 8-K Group D,
E side 251
1988 0
0 X=340.000
Y=730.000 8-L Group E,
Str. 5 252
1988 0
0 X=320.000
Y=280.000 8-G large
platform SW of well 253
1988 05/30/88 11 7
X=283.538 Y=544.081
7-J carbon in assoc. with sascab NO CERAMICS 254
1988 05/30/88 11 7
X=283.538 Y=544.081
7-J NO CERAMICS 255
1988 05/30/88 11 7
X=283.538 Y=544.081
7-J 256
1988 05/30/88 11 7
X=283.538 Y=544.081
7-J 257
1988 05/30/88 11 7
X=283.538 Y=544.081
7-J 258
1988 0
0 X=200.000
Y=300.000 7-H SSC H7 259
1988 05/30/88 0 0
X=310.000 Y=250.000
8-G location needs to be checked RSTR 6 260
1988 05/30/88 11 7
X=283.538 Y=544.081
7-J 261
1988 05/30/88 0 0
X=100.000 Y=300.000
6-H SSC 262
1988 05/30/88 11 7
X=283.538 Y=544.081
7-J 263
1988 05/30/88 0 0
X=292.500 Y=274.500
7-G 20m south of graves 264
1988 05/30/88 0 0
X=100.000 Y=400.000
6-I SSC 265
1988 05/30/88 11 8
X=283.538 Y=544.081
7-J 266
1988 05/31/88 12 1
X=318.585 Y=563.642
8-J colonial sherd ? 267
1988 06/11/88 11 10 X=283.538
Y=544.081 7-J 268
1988 11 11
X=283.538 Y=544.081
7-J 269
1988 05/01/88 12 2
X=318.585 Y=563.642
8-J NO CERAMICS 270
1988 0
0 X=335.000
Y=300.000 8-H 10m
south of modern well 271
1988 06/03/88 0 0
X=500.000 Y=200.000
10-G SSC 272
1988 0
0 X=275.000
Y=227.000 7-G high
quarry trail from lagoon road G7 273
1988 05/24/88 0 0
X=0.000 Y=0.000
0- by Rachel 274
1988 0
0 X=340.000
Y=250.000 8-G 275
1988 05/25/88 0 0
X=190.000 Y=350.000
6-H recon SW of plaza 276
1988 06/03/88 0 0
X=200.000 Y=400.000
7-I SSC 277
1988 05/31/88 5 4
X=221.646 Y=379.169
7-H Hanson 278
1988 06/03/88 0 0
X=232.000 Y=345.000
7-H recon S of plaza 279
1988 11 99
X=283.538 Y=544.081
7-J side wall cleaning to 100 cm 280
1988 0
0 X=284.000
Y=547.000 7-J 1m N of
Pit 11 281
1988 0
0 X=275.000
Y=306.000 7-H from
platform across the path in H7 282
1988 06/01/88 0 0
X=284.000 Y=547.000
7-J NO CERAMICS near Pit 11 283
1988 0
0 X=0.000
Y=0.000 0-
no lot ?? NO MATERIAL 284
1988 0
0 X=300.000
Y=350.000 8-H behind
INAH office on platform 285
1988 11
9 X=283.538
Y=544.081 7-J 286
1988 06/01/88 12 1
X=318.585 Y=563.642
8-J Brown 287
1988 06/01/88 12 1
X=318.585 Y=563.642
8-J surface, Brown 288
1988 5
6 X=221.646
Y=379.169 7-H ceramic
in stucco floor, Hanson 289
1988 05/31/88 11 99 X=283.538
Y=544.081 7-J wall
cleaning to 100 cm 290
1988 0
0 X=0.000
Y=0.000 0-
Archer platform near 92 291
1988 12
0 X=318.585
Y=563.642 8-J surface 292
1988 05/31/88 11 8
X=283.538 Y=544.081
7-J Brown 293
1988 06/01/88 11 10 X=283.538
Y=544.081 7-J Brown 294
1988 06/01/88 12 2
X=318.585 Y=563.642
8-J Brown 295
1988 06/01/88 0 0
X=-90.000 Y=475.000
5-I milpa of Pedro Coba Caamal 296
1988 06/01/88 5 5
X=221.646 Y=379.169
7-H Hanson 297
1988 06/01/88 12 12 X=318.585
Y=563.642 8-J Brown 298
1988 06/01/88 0 0
X=-90.000 Y=475.000
5-I milpa of Pedro Coba Caamal 299
1988 0
0 X=215.000
Y=315.000 7-H
Archer/Hamilton approx SE quad H7 300
1988 0
0 X=270.000
Y=290.000 7-G Archer
near platfor in path 301
1988 06/01/88 0 0
X=0.000 Y=0.000
0- SSC S side of 3 strs of C I7
beside way 302
1988 05/30/88 0 0
X=500.000 Y=500.000
10-J 303
1988 05/31/88 11 99 X=283.538
Y=544.081 7-J side
wall cleaning, Brown 304
1988 05/30/88 0 0
X=500.000 Y=600.000
10-K SSC Shires 305
1988 06/01/88 0 0
X=65.000 Y=300.000
5-H Rancho Culebra 306
1988 06/01/88 11 9
X=283.538 Y=544.081
7-J Brown 307
1988 06/01/88 11 10 X=283.538
Y=544.081 7-J Brown 308
1988 06/01/88 5 6
X=221.646 Y=379.169
7-H Hanson 309
1988 06/01/88 12 2
X=318.585 Y=563.642
8-J Brown 310
1988 05/27/88 11 5
X=283.538 Y=544.081
7-J Brown 311
1988 05/31/88 11 8
X=283.538 Y=544.081
7-J 312
1988 0
0 X=310.000
Y=250.000 8-G check
coords Group C 104 313
1988 05/21/88 0 0
X=0.000 Y=0.000
0- CHUNKOPO 314
1988 06/03/88 0 0
X=400.000 Y=200.000
9-G SSC Shires 315
1988 06/03/88 0 0
X=100.000 Y=400.000
6-I SSC Shires 316
1988 06/02/88 0 0
X=0.000 Y=300.000
0- SSC Shires 317
1988 06/02/88 0 0
X=200.000 Y=200.000
7-G SSC Shires 318
1988 06/01/88 0 0
X=600.000 Y=900.000
11-N SSC Shires 319
1988 06/02/88 0 0
X=500.000 Y=100.000
10-F SSC Shires 320
1988 05/31/88 0 0
X=700.000 Y=700.000
12-L SSC Shires 321
1988 06/01/88 0 0
X=600.000 Y=800.000
11-M SSC Shires 322
1988 06/01/88 0 0
X=500.000 Y=800.000
10-M SSC Shires 323
1988 06/02/88 0 0
X=300.000 Y=100.000
8-F SSC Shires 324
1988 0
0 X=180.000
Y=310.000 6-H Platform
south of path 325
1988 06/02/88 0 0
X=400.000 Y=200.000
9-G recon G8 326
1988 06/01/88 0 0
X=400.000 Y=800.000
9-M SSC 327
1988 05/30/88 11 8
X=283.538 Y=544.081
7-J carbon NO CERAMICS 328
1988 05/31/88 0 0
X=400.000 Y=700.000
9-L SSC Shires 329
1988 05/31/88 0 0
X=600.000 Y=600.000
11-K SSC Shires 330
1988 05/31/88 0 0
X=600.000 Y=700.000
11-L SSC Shires 331
1988 05/31/88 0 0
X=500.000 Y=700.000
10-L SSC Shires 332
1988 05/27/88 11 4
X=283.538 Y=544.081
7-J 333
1988 05/27/88 11 3
X=283.538 Y=544.081
7-J 334
1988 05/27/88 11 4
X=283.538 Y=544.081
7-J 335
1988 05/27/88 11 4
X=283.538 Y=544.081
7-J 336
1988 05/27/88 11 3
X=283.538 Y=544.081
7-J 337
1988 05/27/88 11 3
X=283.538 Y=544.081
7-J 338
1988 05/27/88 11 4
X=283.538 Y=544.081 7-J 339
1988 05/27/88 11 6
X=283.538 Y=544.081
7-J 340
1988 05/27/88 11 5
X=283.538 Y=544.081
7-J 341
1988 05/27/88 11 6
X=283.538 Y=544.081
7-J 342
1988 05/27/88 11 5
X=283.538 Y=544.081
7-J 343
1988 05/27/88 11 5 X=283.538
Y=544.081 7-J 344
1988 05/27/88 11 3
X=283.538 Y=544.081
7-J 345
1988 05/27/88 11 6
X=283.538 Y=544.081
7-J 346
1988 06/06/88 12 5
X=318.585 Y=563.642
8-J Sections A & B 347
1988 06/03/88 11 13 X=283.538
Y=544.081 7-J 348
1988 06/06/88 5 14 X=221.646
Y=379.169 7-H 349
1988 06/06/88 5 13 X=221.646
Y=379.169 7-H from
beneath sacbe 350
1988 06/06/88 5 14 X=221.646
Y=379.169 7-H 351
1988 06/06/88 3 2
X=753.164 Y=335.647
12-H 352
1988 06/06/88 5 14 X=221.646
Y=379.169 7-H 353
1988 06/06/88 5 14 X=221.646
Y=379.169 7-H 354
1988 06/03/88 11 12 X=283.538
Y=544.081 7-J 355
1988 06/07/88 5 17 X=221.646
Y=379.169 7-H 356
1988 06/07/88 3 4
X=753.164 Y=335.647
12-H 357
1988 06/03/88 11 13 X=283.538
Y=544.081 7-J 358
1988 06/06/88 5 15 X=221.646
Y=379.169 7-H 359
1988 06/06/88 5 14 X=221.646
Y=379.169 7-H 360
1988 06/07/88 5 16 X=221.646
Y=379.169 7-H 361
1988 06/07/88 3 4
X=753.164 Y=335.647
12-H 362
1988 06/06/88 5 14 X=221.646
Y=379.169 7-H Hanson 363
1988 06/06/88 5 15 X=221.646
Y=379.169 7-H Hanson 364
1988 06/06/88 5 14 X=221.646
Y=379.169 7-H Hanson 365
1988 06/07/88 3 3
X=753.164 Y=335.647
12-H Archer 366
1988 05/30/88 11 8
X=283.538 Y=544.081
7-J Brown 367
1988 06/06/88 3 2
X=753.164 Y=335.647
12-H Archer 368
1988 06/07/88 3 3
X=753.164 Y=335.647
12-H Archer 369
1988 06/07/88 3 5
X=753.164 Y=335.647
12-H Archer 370
1988 06/07/88 3 4
X=753.164 Y=335.647
12-H Archer 371
1988 05/31/88 5 4
X=221.646 Y=379.169
7-H Level 4 b Hanson 372
1988 06/07/88 3 5
X=753.164 Y=335.647
12-H Archer 373
1988 06/02/88 5 17 X=221.646
Y=379.169 7-H Hanson 374
1988 06/07/88 11 18 X=283.538
Y=544.081 7-J Brown 375
1988 06/07/88 11 16 X=283.538
Y=544.081 7-J Brown 376
1988 06/07/88 11 17 X=283.538
Y=544.081 7-J Brown 377
1988 06/07/88 11 15 X=283.538
Y=544.081 7-J Brown 378
1988 0
0 X=117.000
Y=281.000 6-G Large
platform on the back (E) fence line of Rancho Culebra 379
1988 0
0 X=117.000
Y=281.000 6-G Large
platform on the back (E) fence line of Rancho Culebra 380
1988 0
0 X=117.000
Y=281.000 6-G Large
platform on the back (E) fence line of Rancho Culebra 381
1988 06/07/88 13 2
X=414.365 Y=621.796
9-K 382
1988 06/07/88 13 2
X=414.365 Y=621.796
9-K 383
1988 06/07/88 13 2
X=414.365 Y=621.796
9-K 384
1988 06/07/88 13 3
X=414.365 Y=621.796
9-K 385
1988 06/07/88 13 2
X=414.365 Y=621.796
9-K 386
1988 06/07/88 13 2
X=414.365 Y=621.796
9-K 387
1988 06/07/88 13 3
X=414.365 Y=621.796
9-K 388
1988 06/03/88 11 12 X=283.538
Y=544.081 7-J 389
1988 06/07/88 13 1
X=414.365 Y=621.796
9-K 390
1988 06/07/88 13 1
X=414.365 Y=621.796
9-K 391
1988 06/07/88 13 3
X=414.365 Y=621.796
9-K 392
1988 06/07/88 13 0
X=414.365 Y=621.796
9-K surface 393
1988 06/08/88 13 3
X=414.365 Y=621.796
9-K 394
1988 06/07/88 13 3
X=414.365 Y=621.796
9-K 395
1988 06/02/88 11 10 X=283.538
Y=544.081 7-J 396
1988 06/07/88 3 3
X=753.164 Y=335.647
12-H 397
1988 06/07/88 3 2
X=753.164 Y=335.647
12-H 398
1988 06/07/88 3 4
X=753.164 Y=335.647
12-H 399
1988 06/06/88 5 15 X=221.646
Y=379.169 7-H
|
|
© Copyright 2000-2005 Walter R. T. Witschey Page last updated Wednesday, April 02, 2008 |